How To Buy
EN
TR

In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information.

  • 4 MP211 Series PLC’s (One for each sea bus)
  • 500 data control via ViewPLUS SCADA
  • The first domestically installed rotary antenna control system in Türkiye
  • Motion control
  • Axis definitions
  • Location tracking system
  • The antenna is fixed in the desired direction by reading the ferry GPS coordinates and the north angle values of the ferry compass with Mikrodev PLC with NMEA protocol, and calculating the correlation between the base station coordinates that the antenna should focus on

Other Post
All Posts
TUBITAK MAM(Marmara Research Center) MARTEK Building Automation & SCADA System
TUBITAK MAM(Marmara Research Center) MARTEK Building Automation & SCADA System
Building automation and SCADA system controls throughout TUBITAK Marmara Research Center MARTEK are made with Mikrodev products and software. Air conditioning, lighting and energy controls of the buil
Read More
Nuh Cimento Group Energy Tracking System
Nuh Cimento Group Energy Tracking System
Mikrodev products were preferred for energy monitoring and reporting systems in critical production processes of Nuh Cimento Group which is one of the largest cement production facilities in Türkiye.
Read More
WIN EURASIA 2023
WIN EURASIA 2023
We left behind the WIN EURASIA 2023 Automation Fair, one of the most important organizations in the region. We presented the new technologies we brought to our products and the new product families we
Read More
Northern Marmara Highway (Türkiye) Energy Monitoring System
Northern Marmara Highway (Türkiye) Energy Monitoring System
Mikrodev products were preferred in the Marmara Highway Energy Monitoring SCADA System located in Türkiye. More than 200 stations located along the highway were integrated into the SCADA system.
Read More
Read Electric Meters with DLMS, Integrate with MODBUS
Read Electric Meters with DLMS, Integrate with MODBUS
Read Electric Meters with DLMS, Integrate with MODBUS In energy management processes, fast, reliable, and easy access to data is becoming increasingly important. One of the most widely used standards
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
In the GASKI Drinking Water Disinfection SCADA System, the chlorination of the water supply distribution networks and the water levels in the tank are monitored throughout in Gaziantep, Türkiye. In th
Read More
What are the Differences Between PLC and RTU? 
What are the Differences Between PLC and RTU? 
In the world of industrial automation, PLC (Programmable Logic Control) and RTU (Remote Terminal Unit) are two substantial devices. They are both used to automate and monitor process control, however,
Read More
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Mikrodev products were used in energy monitoring and controls throughout the Inegol Organized Industrial Zone in Bursa, Türkiye. Cutter position information, controls and fault tracking are done throu
Read More
What is Programmable Logic Controller Systems (PLC)?
What is Programmable Logic Controller Systems (PLC)?
What is Programmable Logic Controller Systems (PLC)?  A PLC is an electronic device used to perform sequencing, timing, speed and motion controls in industrial systems. These devices allow for logica
Read More
SCADA and RTU Architecture for Water Distribution and Treatment Facilities
SCADA and RTU Architecture for Water Distribution and Treatment Facilities
The management, distribution, and wastewater treatment processes of water resources have evolved from manual controls to fully automated, intelligent systems. At the heart of this transformation are W
Read More
CATALOG