How To Buy
EN
TR

Mikrodev IoT protocol converter product family was preferred in the IMES Organized Industrial Zone Automatic Meter Reading System Project. In the current system, data of more than 600 electricity meters are read through the SC100 Series IoT Gateway product family. Data transfer to remote systems is carried out via the integrated GSM modem.

  • Over 250 stations
  • Over 250 SC100 series Serial Device Server
  • Up to 600 electric meters
  • Invoicing system fully compatible with changing legislation
  • Billing designs in accordance with energy regulations
  • Energy data tracking and analysis portals
  • Prospective energy consumption estimation tools
  • Daily, monthly, annual reporting on a station bases

Other Post
All Posts
AFAD Disaster And Emergency Management Presidency Shelter & Command Center Automation
AFAD Disaster And Emergency Management Presidency Shelter & Command Center Automation
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in the Shelter and Command Center Automation. In the shelter system, alarm monitoring, energy monitoring and HVAC system contro
Read More
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Drinking water controls of 350 stations throughout Mugla province in Türkiye are made through Mikrodev RTU products and ViewPLUS SCADA software. In the system, well and tank operation/failure conditio
Read More
DMA-Based Leak Detection in Water SCADA: RTU and Pressure Transient Analysis
DMA-Based Leak Detection in Water SCADA: RTU and Pressure Transient Analysis
Pressure to reduce water losses in utilities increases every year. Moreover, the problem is not limited to water loss alone; energy costs, network lifespan, and field workload also rise simultaneously
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
Importance of Calendar and Timing Functions and PLC Programming
Importance of Calendar and Timing Functions and PLC Programming
Industrial automation is the cornerstone of process control in modern manufacturing facilities. PLC (Programmable Logic Controller) systems are used to manage automation control, which is the foundati
Read More
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
In the evening hours, voltage drops on a feeder, lights flicker on some streets, the field team says “the transformer is overloaded,” but no one at the control center can speak clearly. This picture i
Read More
Motion Control with PLC & the Real Applications via Microdev PLC Devices
Motion Control with PLC & the Real Applications via Microdev PLC Devices
Programmable Logic Controllers (PLCs) are widely used in the industrial automation industry to control and monitor various processes. One of the main functions of PLCs is motion control, which involve
Read More
Security of SCADA Systems
Security of SCADA Systems
Security of SCADA Systems In today's interconnected world, where technology permeates nearly every aspect of our lives, the security of supervisory control and data acquisition (SCADA) systems has be
Read More
National Bank of Saudi Arabia ATM Control Automation
National Bank of Saudi Arabia ATM Control Automation
Mikrodev MP211 series PLC products were used in the ATM Control Automation project of the National Bank of Saudi Arabia. At more than 80 stations, the operating status of the ATM cabinet, cabin securi
Read More
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
Imagine a water reservoir located outside the city. The water level inside drops rapidly at midnight, the pump needs to start, but there is no one on site. If it takes hours for a technician to arrive
Read More
CATALOG