How To Buy
EN
TR

Mikrodev products were preferred in the Marmara Highway Energy Monitoring SCADA System located in Türkiye. More than 200 stations located along the highway were integrated into the SCADA system.

  • More than 200 stations
  • Data transfer to SCADA system via MODBUS protocol
  • Energy and power value calculations
  • Operation, fault status information tracking
  • Energy equipment position location information
  • Automatic or manual system control

Other Post
All Posts
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation     In the dynamic landscape of modern industries, the concept of industrial automation has emerged as a fundamental driver of efficiency, prec
Read More
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Mikrodev products were used in energy monitoring and controls throughout the Inegol Organized Industrial Zone in Bursa, Türkiye. Cutter position information, controls and fault tracking are done throu
Read More
What are the Differences Between PLC and RTU? 
What are the Differences Between PLC and RTU? 
In the world of industrial automation, PLC (Programmable Logic Control) and RTU (Remote Terminal Unit) are two substantial devices. They are both used to automate and monitor process control, however,
Read More
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
As modern energy grids evolve from one-way power flow to two-way, dynamic, and smart grid structures, the backbone of this transformation is formed by communication protocols. In a Substation Automati
Read More
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
In industrial or commercial IoT projects, IoT gateways play a crucial role in ensuring accurate and fast data flow between devices. An IoT gateway brings together different protocols, devices, and app
Read More
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
RTU and PLC products installed in more than 200 wells, warehouses and pumping centers throughout Trabzon are managed through the ViewPlus SCADA software in the TİSKİ Control Center. Over 200 well
Read More
WHAT IS THE IEC61850 ?
WHAT IS THE IEC61850 ?
What is the IEC61850 ? IEC61850, especially used in electrical distribution systems, is a communication protocol. IEC61850 was developed to standardize and facilitate data exchange between components
Read More
What is Programmable Logic Controller Systems (PLC)?
What is Programmable Logic Controller Systems (PLC)?
What is Programmable Logic Controller Systems (PLC)?  A PLC is an electronic device used to perform sequencing, timing, speed and motion controls in industrial systems. These devices allow for logica
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Mikrodev PLC products were preferred in the follow-up and control of the processes of Türkiye's first sludge incineration plant in Gaziantep. The process is carried out at 850 to 1100 degrees Celsius.
Read More
Republic of Türkiye General Directorate of State Hydraulic Works Flow Observation Station
Republic of Türkiye General Directorate of State Hydraulic Works Flow Observation Station
Mikrodev PLC products were preferred in more than 30 stations in the Flow Observation Station project of the General Directorate of State Hydraulic Works. - MP211EGL PLC products were used in the f
Read More
CATALOG