How To Buy
EN
TR

Mikrodev RTU300 series remote terminal unit products are used at more than 350 stations in the drinking water distribution system in Tekirdag, Türkiye. The data at each point is sent to the central SCADA system via the GSM module integrated into the RTU300 series.

  • Over 350 stations
  • Over 500 units Mikrodev RTU300 series RTU and XIO211 series expansion module
  • Over 25000 data control via ViewPLUS SCADA
  • Data transmission to Viewplus SCADA via MODBUS, IEC 60870-5-104, DNP3 protocol
  • Logging via RTU300 with IEC 60870-5-104 and auto sending logs to SCADA
  • Tank to well M2M communications can be monitored through a variety of applications such as water level controls, tank level controls, flow pressure, chlorine turbidity pH measurements, well water follow-ups, total water measurements given to the system, pump run times and maintenance follow-up
  • Information such as pump, flow rate, water on the line, well condition, tank condition, GSM signal condition, panel battery condition, well utilization can be reached through well and promotion control pages

 

 

Other Post
All Posts
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Mikrodev PLC products were preferred in the follow-up and control of the processes of Türkiye's first sludge incineration plant in Gaziantep. The process is carried out at 850 to 1100 degrees Celsius.
Read More
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information. 4 MP211
Read More
Read Electric Meters with DLMS, Integrate with MODBUS
Read Electric Meters with DLMS, Integrate with MODBUS
Read Electric Meters with DLMS, Integrate with MODBUS In energy management processes, fast, reliable, and easy access to data is becoming increasingly important. One of the most widely used standards
Read More
What is a Distributed Control System (DCS)?
What is a Distributed Control System (DCS)?
Distributed Control System (DCS) is an automation system and is used to control a manufacturing facility or an industrial process. These systems work in connection with each other by communicating man
Read More
What are Industrial Automation Products?
What are Industrial Automation Products?
What are Industrial Automation Products? Industrial automation involves using control systems, computers, and robots to automate an enterprise's production processes; and industrial automation produc
Read More
Republic of Türkiye General Directorate of State Hydraulic Works Flow Observation Station
Republic of Türkiye General Directorate of State Hydraulic Works Flow Observation Station
Mikrodev PLC products were preferred in more than 30 stations in the Flow Observation Station project of the General Directorate of State Hydraulic Works. - MP211EGL PLC products were used in the f
Read More
Aramco Emergency Shutdown System (ESD)
Aramco Emergency Shutdown System (ESD)
Aramco, the oil company of Saudi Arabia, which is among the top three most valuable companies in the world, preferred MP211 Series Mikrodev PLC products for Emergency Shutdown System (ESD) controls of
Read More
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
RTU300 series remote terminal unit products and MBS100 series MODBUS gateway product were used in the RMS system commissioned in Georgia. Energy data is monitored over the ViewPLUS SCADA system over M
Read More
AFAD Disaster and Emergency Management Presidency Shelter Control System & Command Center Automation
AFAD Disaster and Emergency Management Presidency Shelter Control System & Command Center Automation
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in the Shelter Control System and Command Center Automation project carried out for AFAD Disaster and Emergency Management Pres
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
CATALOG