Mikrodev products were used in energy monitoring and controls throughout the Inegol Organized Industrial Zone in Bursa, Türkiye. Cutter position information, controls and fault tracking are done through the ViewPLUS SCADA system. Energy data of electricity meters and energy analyzers are transferred to SCADA with Mikrodev IoT protocol converters.

  • Over 30 Mikrodev RTU series
  • Over 100 MDC100 series MOD-C to MODBUS gateways
  • Over 100 MBS100 series MODBUS gateways
  • Over 10000 data control via ViewPLUS SCADA
  • Reading the data of cells in transformer substations via RTU340 (IEC 61850 MMS Client)
  • Motorized circuit breaker control and fault detection
  • Instant data transfer to ViewPLUS SCADA over IEC 60870-5-104 protocol
  • Monitoring rectifier alarms and fire alarms in substations
  • Monitoring the energy analyzers
  • Monitoring electric meters
  • Monitoring natural gas meters
  • Monitoring the waste-water flow meters
  • Monitoring the water meters
  • Monitoring and control of clean water wells

Other Post
All Posts
Industrial Scalability in MQTT with Sparkplug B: The Right Topology and Automatic Discovery
Industrial Scalability in MQTT with Sparkplug B: The Right Topology and Automatic Discovery
The number of devices in the IIoT field is increasing rapidly. The free structure of MQTT is flexible, but in large facilities, this freedom can turn into disorder. This is where MQTT Sparkplug B come
Read More
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
As modern energy grids evolve from one-way power flow to two-way, dynamic, and smart grid structures, the backbone of this transformation is formed by communication protocols. In a Substation Automati
Read More
What Is Modbus?
What Is Modbus?
What Is Modbus and What Is It Used For? Modbus is a communication protocol used in the industrial automation sector. It was developed by Modicon (now Schneider Electric) in 1979 primarily for com
Read More
National Bank of Saudi Arabia ATM Control Automation
National Bank of Saudi Arabia ATM Control Automation
Mikrodev MP211 series PLC products were used in the ATM Control Automation project of the National Bank of Saudi Arabia. At more than 80 stations, the operating status of the ATM cabinet, cabin securi
Read More
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
RTU300 series remote terminal unit products and MBS100 series MODBUS gateway product were used in the RMS system commissioned in Georgia. Energy data is monitored over the ViewPLUS SCADA system over M
Read More
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
If power quality is not visible, it cannot be managed. With SCADA integration, it is now possible to view Power Quality (PQ) data on a single screen, take rapid action during a fault, clarify maintena
Read More
Kayseray Energy Monitoring and Control SCADA System
Kayseray Energy Monitoring and Control SCADA System
Energy monitoring and control, catenary line monitoring and control and switch position information of more than 20 substations within Kayseray, a light rail public transportation system that started
Read More
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
In previous blog titled “What is PLC Programming?”, MODBUS PROTOCOL Blocks and MODBUS RTU MODBUS Master and MODBUS RTU Slave connection and programming in Mikrodev MP110 and MP211 PLC Series devices a
Read More
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
How accurate is time alignment in industrial systems? Time synchronization means reliable data and accurate decisions in the field. An incorrect clock creates large gaps in fault analysis and quality
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
CATALOG