How To Buy
EN
TR

Smart city system control is carried out within the body of İstanbul Metropolitan Municipality Energy Management and Lighting Directorate. Energy monitoring and efficiency calculations, as well as elevator, escalator, overpass and lighting system control and monitoring are carried out at more than 400 stations in the province through Mikrodev PLC and Gateway products. Alarm monitoring is performed and reports can be received via ViewPLUS SCADA.

  • Over 400 stations
  • Over 300 MP211 Series PLC
  • Over 20000 data control
  • Over 20000 alarm monitoring
  • Unlimited ViewPLUS SCADA licences
  • Monitoring and control of lighting of parks and architectural structures
  • Tracking of inverters used in renewable energy systems
  • Monitoring of power analyzers
  • Tracking of generators
  • Tracking elevators and escalators
  • Remote Smart Water/Energy Metering
  • Energy efficiency calculations
  • Monitoring the number of active stations on the graph

Other Post
All Posts
What Is Modbus?
What Is Modbus?
What Is Modbus and What Is It Used For? Modbus is a communication protocol used in the industrial automation sector. It was developed by Modicon (now Schneider Electric) in 1979 primarily for com
Read More
Indonesia PLN Power Distribution System
Indonesia PLN Power Distribution System
Indonesian energy distribution company, energy monitoring and control system at more than 500 stations is made through the RTU300 series remote terminal unit. Reading the data of cells in transfo
Read More
Security of SCADA Systems
Security of SCADA Systems
Security of SCADA Systems In today's interconnected world, where technology permeates nearly every aspect of our lives, the security of supervisory control and data acquisition (SCADA) systems has be
Read More
Arçelik Chooses Mikrodev Products for TV Remote Control Functional Test System
Arçelik Chooses Mikrodev Products for TV Remote Control Functional Test System
Arçelik strengthened its motion control system to enhance the quality of remote controls for televisions by opting for Mikrodev products in the TV remote control functional test system. Utilizing the
Read More
Northern Marmara Highway (Türkiye) Energy Monitoring System
Northern Marmara Highway (Türkiye) Energy Monitoring System
Mikrodev products were preferred in the Marmara Highway Energy Monitoring SCADA System located in Türkiye. More than 200 stations located along the highway were integrated into the SCADA system.
Read More
Salda Lake Environmental Protection Wastewater Management System
Salda Lake Environmental Protection Wastewater Management System
MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry o
Read More
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
Risks in Operational Technology (OT) are growing, and errors are turning into downtime and costs. IEC 62443 is a family of role- and process-oriented standards recognized as the reference for cybersec
Read More
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation     In the dynamic landscape of modern industries, the concept of industrial automation has emerged as a fundamental driver of efficiency, prec
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Mikrodev PLC products were preferred in the follow-up and control of the processes of Türkiye's first sludge incineration plant in Gaziantep. The process is carried out at 850 to 1100 degrees Celsius.
Read More
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
An outage can start as ordinarily as a single relay falling silent in the field. Then alarms rain down, data flow stops, and decision-making is delayed. In sectors like energy, water, wastewater, oil
Read More
CATALOG