How To Buy
EN
TR

In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information.

  • 4 MP211 Series PLC’s (One for each sea bus)
  • 500 data control via ViewPLUS SCADA
  • The first domestically installed rotary antenna control system in Türkiye
  • Motion control
  • Axis definitions
  • Location tracking system
  • The antenna is fixed in the desired direction by reading the ferry GPS coordinates and the north angle values of the ferry compass with Mikrodev PLC with NMEA protocol, and calculating the correlation between the base station coordinates that the antenna should focus on

Other Post
All Posts
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
SCADA systems—at the heart of industrial automation—ensure the management of production lines and the continuity of processes. While these systems supervise critical sectors such as energy, water, gas
Read More
Northern Marmara Highway (Türkiye) Energy Monitoring System
Northern Marmara Highway (Türkiye) Energy Monitoring System
Mikrodev products were preferred in the Marmara Highway Energy Monitoring SCADA System located in Türkiye. More than 200 stations located along the highway were integrated into the SCADA system.
Read More
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Mikrodev IoT protocol gateway product family was preferred in the Istanbul Anadolu Yakası OIZ Automatic Meter Reading System Project in Türkiye. In the current system, over the MDC100 Series IoT Gatew
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
In the GASKI Drinking Water Disinfection SCADA System, the chlorination of the water supply distribution networks and the water levels in the tank are monitored throughout in Gaziantep, Türkiye. In th
Read More
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Drinking water controls of 350 stations throughout Mugla province in Türkiye are made through Mikrodev RTU products and ViewPLUS SCADA software. In the system, well and tank operation/failure conditio
Read More
National Bank of Saudi Arabia ATM Control Automation
National Bank of Saudi Arabia ATM Control Automation
Mikrodev MP211 series PLC products were used in the ATM Control Automation project of the National Bank of Saudi Arabia. At more than 80 stations, the operating status of the ATM cabinet, cabin securi
Read More
RTU vs. PLC: Fundamental Comparison in Terms of Differences, Usage Areas, and Control Systems
RTU vs. PLC: Fundamental Comparison in Terms of Differences, Usage Areas, and Control Systems
Success in the field of automation begins with choosing the right control system. RTU (Remote Terminal Unit) and PLC (Programmable Logic Controller) are two fundamental devices used to safely manage c
Read More
Importance of Calendar and Timing Functions and PLC Programming
Importance of Calendar and Timing Functions and PLC Programming
Industrial automation is the cornerstone of process control in modern manufacturing facilities. PLC (Programmable Logic Controller) systems are used to manage automation control, which is the foundati
Read More
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
In previous blog titled “What is PLC Programming?”, MODBUS PROTOCOL Blocks and MODBUS RTU MODBUS Master and MODBUS RTU Slave connection and programming in Mikrodev MP110 and MP211 PLC Series devices a
Read More
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
An outage can start as ordinarily as a single relay falling silent in the field. Then alarms rain down, data flow stops, and decision-making is delayed. In sectors like energy, water, wastewater, oil
Read More
CATALOG