How To Buy
EN
TR

In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information.

  • 4 MP211 Series PLC’s (One for each sea bus)
  • 500 data control via ViewPLUS SCADA
  • The first domestically installed rotary antenna control system in Türkiye
  • Motion control
  • Axis definitions
  • Location tracking system
  • The antenna is fixed in the desired direction by reading the ferry GPS coordinates and the north angle values of the ferry compass with Mikrodev PLC with NMEA protocol, and calculating the correlation between the base station coordinates that the antenna should focus on

Other Post
All Posts
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation     In the dynamic landscape of modern industries, the concept of industrial automation has emerged as a fundamental driver of efficiency, prec
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
SCADA systems—at the heart of industrial automation—ensure the management of production lines and the continuity of processes. While these systems supervise critical sectors such as energy, water, gas
Read More
Kocaeli-Gebze VI. (IMES) OIZ Energy Tracking System
Kocaeli-Gebze VI. (IMES) OIZ Energy Tracking System
Mikrodev IoT protocol converter product family was preferred in the IMES Organized Industrial Zone Automatic Meter Reading System Project. In the current system, data of more than 600 electricity mete
Read More
FAQs (Frequently Asked Questions) About PLC
FAQs (Frequently Asked Questions) About PLC
Programmable logic control systems (PLC) have become an indispensable tool of modern industrial automation. Programmable logic controllers are an essential cog in industrial systems and provide flexib
Read More
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Mikrodev RTU300 series remote terminal unit and ViewPLUS SCADA software were preferred in Malatya İnönü University SCADA Automation System. Many different systems such as Water, Energy, Building HVAC
Read More
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
RTU and PLC products installed in more than 200 wells, warehouses and pumping centers throughout Trabzon are managed through the ViewPlus SCADA software in the TİSKİ Control Center. Over 200 well
Read More
Understanding the Differences Between PLC, DCS & SCADA
Understanding the Differences Between PLC, DCS & SCADA
Understanding the Differences Between PLC, DCS & SCADA - A Selection Guide In today's industrial landscape, the selection of an appropriate control system architecture plays a pivotal role in ens
Read More
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Bursa Inegol OIZ 34.5 KV Medium Voltage Power Distribution Network SCADA System
Mikrodev products were used in energy monitoring and controls throughout the Inegol Organized Industrial Zone in Bursa, Türkiye. Cutter position information, controls and fault tracking are done throu
Read More
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
An outage can start as ordinarily as a single relay falling silent in the field. Then alarms rain down, data flow stops, and decision-making is delayed. In sectors like energy, water, wastewater, oil
Read More
CATALOG