How To Buy
EN
TR

Mikrodev RTU300 series remote terminal unit and ViewPLUS SCADA software were preferred in Malatya İnönü University SCADA Automation System. Many different systems such as Water, Energy, Building HVAC were combined on a single SCADA software. In this respect, it has become an exemplary project focused on energy and operational efficiency in every field.

  • More than 20 stations, Mikrodev RTU300 series remote terminal unit
  • Over 2000 data controls via ViewPLUS SCADA
  • Data transmission to ViewPLUS SCADA over MODBUS and IEC60870-5-104 communication protocols
  • Report and alarm tracking without data loss
  • Tank level monitoring
  • Co-aging pump control
  • Building air conditioning, HVAC automation control within the campus
  • Campus-wide energy tracking system
  • Meter reading systems

 

 

Other Post
All Posts
Tekirdag City Water and Sewerage Administration (TESKI) Water Distribution SCADA System
Tekirdag City Water and Sewerage Administration (TESKI) Water Distribution SCADA System
Mikrodev RTU300 series remote terminal unit products are used at more than 350 stations in the drinking water distribution system in Tekirdag, Türkiye. The data at each point is sent to the central SC
Read More
Arçelik Chooses Mikrodev Products for TV Remote Control Functional Test System
Arçelik Chooses Mikrodev Products for TV Remote Control Functional Test System
Arçelik strengthened its motion control system to enhance the quality of remote controls for televisions by opting for Mikrodev products in the TV remote control functional test system. Utilizing the
Read More
Salda Lake Environmental Protection Wastewater Management System
Salda Lake Environmental Protection Wastewater Management System
MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry o
Read More
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
PLCs (Programmable Logic Controllers), one of the indispensable elements of industrial automation, are one of the main tools used today to regulate and control complex production processes. PLC progra
Read More
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
In SCADA projects, thousands—sometimes even hundreds of thousands—of data points flow every second.Temperature, pressure, motor current, meter values… All of them are continuously generated together w
Read More
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Mikrodev RTU300 series remote terminal unit and ViewPLUS SCADA software were preferred in Malatya İnönü University SCADA Automation System. Many different systems such as Water, Energy, Building HVAC
Read More
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation     In the dynamic landscape of modern industries, the concept of industrial automation has emerged as a fundamental driver of efficiency, prec
Read More
What is Data Management in PLC and the Advantages of Using Data Management ?
What is Data Management in PLC and the Advantages of Using Data Management ?
In the realm of industrial automation, Programmable Logic Controllers (PLCs) stand out as crucial automatic control devices, frequently employed in industrial sectors. As we emphasized in our blog pos
Read More
National Bank of Saudi Arabia ATM Control Automation
National Bank of Saudi Arabia ATM Control Automation
Mikrodev MP211 series PLC products were used in the ATM Control Automation project of the National Bank of Saudi Arabia. At more than 80 stations, the operating status of the ATM cabinet, cabin securi
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
CATALOG