As modern energy grids evolve from one-way power flow to two-way, dynamic, and smart grid structures, the backbone of this transformation is formed by communication protocols. In a Substation Automation project, the conversion of physical quantities in the field (current, voltage, circuit breaker status, etc.) into digital data and its transfer to the control center is directly related to the capabilities of the selected protocol.

Today, there are three main protocol families that have become industry standards: IEC 60870-5 seriesDNP3, and IEC 61850. In this article, we will deeply examine the technical architectures of these protocols, their advantages over each other, and how the correct protocol selection should be made in Substation SCADA projects, from the perspective of Mikrodev RTU and automation solutions.

The Evolution of Communication in Energy Automation

In conventional substations (conventional systems), protection and control were performed via analog signals and dry contacts carried by thousands of meters of copper cable. This structure was a difficult-to-maintain, costly-to-expand, and complex-to-diagnose fault system.

With digitalization, Intelligent Electronic Devices (IEDs) came into play. Protection relays, energy analyzers, and RTUs (Remote Terminal Units) have now become communicating computers. However, the necessity for these devices to “speak the same language” created the need for standardization. This is where IEC and IEEE standards came in.

The Standard of Telecontrol: IEC 60870-5

The IEC 60870 standards, developed by the European-based IEC (International Electrotechnical Commission), are specifically designed for telecontrol (remote supervision) systems. This is the standard widely used by TEİAŞ (Turkish Electricity Transmission Co.) and distribution companies in Turkey.

IEC 60870-5-101 (Serial Communication)

Defines communication over serial ports (RS232/RS485). It can operate at low bandwidth but is limited to point-to-point or multidrop structures. Today, it is being replaced by its TCP/IP-based version in modern projects, but it is still actively used in legacy systems.

IEC 60870-5-104 (TCP/IP Communication)

It takes the application layer of IEC 101 and wraps it into TCP/IP packets at the transport layer. This enables data transmission over Ethernet networks, Fiber Optic infrastructures, and 4G/LTE modems.

Technical Features and Advantages:

  • Event-Driven Transmission: Instead of continuous polling, data is only sent when it changes (e.g., when a circuit breaker opens). This utilizes bandwidth efficiently.
  • Time Stamping: The time of occurrence of events is recorded with millisecond accuracy. This is critical for post-mortem analysis.
  • Buffering: When communication is lost, devices like Mikrodev RTU300 store the data in their internal memory and transmit it to the center retroactively when the connection is restored.

North America’s Choice: DNP3 (Distributed Network Protocol)

DNP3 is an open protocol initially developed for the electric and water sectors, standardized especially in North America. Although it serves similar purposes to IEC 60870, it has some structural superiorities.

Why DNP3?

  • Fragmentation: DNP3 can divide large data packets into smaller pieces for transmission. This increases transmission success over noisy and low-quality lines.
  • Classification (Class 0, 1, 2, 3): Data is categorized by priority. Critical alarms (Class 1) can be sent before normal measurements (Class 3).
  • Unsolicited Responses: The Slave device (RTU) can spontaneously send data when an important event occurs, without waiting for the Master to query.

DNP3, which is frequently encountered in water and wastewater projects, is also preferred in Energy Transmission Automation projects, especially in challenging field conditions.

The Game Changer: IEC 61850

IEC 61850 is not just a protocol but a comprehensive engineering and communication standard for substations. Unlike other protocols, it adopts the philosophy of “replacing wires with communication.”

Key Differences:

  1. Object-Oriented Modeling: A circuit breaker is not just a “bit”; it is an object defined by its status, health, and number of operations under the “XCBR” logical node.
  2. SCL (Substation Configuration Language): System configuration is done with XML-based files (SCL, ICD, SCD). This ensures that different brands (Mikrodev, Siemens, ABB, etc.) recognize each other (Interoperability).

IEC 61850 Sub-Protocols: GOOSE and MMS

In a Substation Automation project, IEC 61850 operates at two main levels:

  • MMS (Manufacturing Message Specification): This is vertical communication. It is used for data transfer from IEDs (Relays, RTUs) to the SCADA center (e.g., ViewPLUS SCADA). It works with a Reporting mechanism.
  • GOOSE (Generic Object Oriented Substation Event): This is horizontal communication. It is very fast communication (< 4ms) between two protection relays or a relay and an RTU, without going through the SCADA.
    • Example: When the protection relay at the transformer inlet sees a fault, it sends a “Trip” command to the other relay at the feeder outlet not via a copper cable, but via an Ethernet network using a GOOSE message.

Protocol Selection Criteria in Substation SCADA Projects

The following matrix should be considered when deciding which protocol to use in a project:

Criteria IEC 60870-5-104 DNP3 IEC 61850
Area of Use WAN (Wide Area Network) WAN / LAN LAN (Local Area Network)
Communication Direction RTU -> Control Center (NCC) RTU -> NCC Device -> Device & Device -> SCADA
Data Structure Point List Index-Based Object-Oriented (Logical Nodes)
Bandwidth Need Low Low High (Especially for GOOSE/SV)
Setup Complexity Low Medium High (Requires Engineering)
Time Synchronization Available Available Very Precise (SNTP/PTP)

Hybrid Architectures and Gateway Requirement

In the real world, a substation is rarely established with a single protocol. Hybrid structures are generally seen:

  • The relays within the site communicate with each other using IEC 61850 (GOOSE).
  • Data is collected in a Data Concentrator.
  • The collected data is sent to the upper-level (Load Dispatch) SCADA system via IEC 60870-5-104.

This is where the “Multiprotocol” capability of Mikrodev RTU devices becomes vital. A Mikrodev device can simultaneously:

  1. Read energy analyzers over Modbus TCP/RTU.
  2. Pull data from protection relays as an IEC 61850 Client.
  3. Present this collected data to the TEİAŞ or EDAŞ center as an IEC 60870-5-104 Slave.
  4. Push the same data to a cloud platform or mobile monitoring application via MQTT.

Protection Relay Communication and RTU Integration

Protection relay communication is the most critical part of the system. Relays are not just devices that operate during a fault; they are sources that constantly produce data about the grid quality (Harmonics, Sag/Swell events).

In old systems, only “Opened/Closed” information was received from the relays, whereas in modern Substation SCADA systems, oscillographic fault records (Disturbance Records) are also retrieved from the relays. These records are used to understand the cause of the fault (lightning strike, line break, insulation fault, etc.).

The Mikrodev RTU product family has libraries that can communicate with different brands of protection relays (Siemens, Schneider, ABB, GE, etc.) both over serial ports (IEC 101, Modbus) and over Ethernet (IEC 104, IEC 61850). This allows for the creation of “Vendor Independent” solutions.

Future Trends: IoT and Big Data

In addition to IEC 61850 and classic SCADA protocols, IoT protocols have also started to enter substations. Light protocols like MQTT or CoAP are used, especially for monitoring non-operational data such as transformer oil temperatures, ambient humidity, and door security.

Mikrodev’s IoT Gateway Solutions can carry this data to cloud-based analysis platforms over a parallel line, without burdening classic SCADA traffic. This enables the execution of “Predictive Maintenance” algorithms.

Correct Integration, Secure Energy

In Substation SCADA projects, protocol selection is not just a technical choice but a strategic decision that affects operating costs and system security.

  • For fast and smart on-site automation: IEC 61850.
  • For stable and standard remote monitoring: IEC 60870-5-104.
  • For harsh and low-bandwidth lines: DNP3.

The most successful projects are those that position each of these protocols according to their strengths and ensure integration with flexible, powerful, and local hardware/software solutions like Mikrodev. Energy transmission automation is rapidly advancing toward a future where fiber optics and smart algorithms replace copper cables.

Other Post
All Posts
Kayseray Energy Monitoring and Control SCADA System
Kayseray Energy Monitoring and Control SCADA System
Energy monitoring and control, catenary line monitoring and control and switch position information of more than 20 substations within Kayseray, a light rail public transportation system that started
Read More
What is a Distributed Control System (DCS)?
What is a Distributed Control System (DCS)?
Distributed Control System (DCS) is an automation system and is used to control a manufacturing facility or an industrial process. These systems work in connection with each other by communicating man
Read More
Increasing Efficiency: Using MODBUS Gateway in PLC Programming
Increasing Efficiency: Using MODBUS Gateway in PLC Programming
In the rapidly evolving landscape of industrial automation, the integration of Programmable Logic Controllers (PLCs) and communication protocols holds vital importance. The aim of this article is to p
Read More
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Drinking water controls of 350 stations throughout Mugla province in Türkiye are made through Mikrodev RTU products and ViewPLUS SCADA software. In the system, well and tank operation/failure conditio
Read More
AFAD Disaster and Emergency Management Presidency Shelter Control System & Command Center Automation
AFAD Disaster and Emergency Management Presidency Shelter Control System & Command Center Automation
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in the Shelter Control System and Command Center Automation project carried out for AFAD Disaster and Emergency Management Pres
Read More
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation
Understanding the Essence of Industrial Automation     In the dynamic landscape of modern industries, the concept of industrial automation has emerged as a fundamental driver of efficiency, prec
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
In the GASKI Drinking Water Disinfection SCADA System, the chlorination of the water supply distribution networks and the water levels in the tank are monitored throughout in Gaziantep, Türkiye. In th
Read More
Ex4S Cyber Defense Simulation in the Energy Sector
Ex4S Cyber Defense Simulation in the Energy Sector
As Mikrodev, we provided Offensive Oriented Simulation infrastructure installations at the Ex4S Cyber Defense Simulation in the Energy Sector event, which was held for the first time this year at Repu
Read More
Pressure Management and Leakage Reduction in Water and Wastewater Networks: An RTU-Focused Approach
Pressure Management and Leakage Reduction in Water and Wastewater Networks: An RTU-Focused Approach
High pressure, aging infrastructure, invisible leaks, and rising energy costs are the silent enemies of water and wastewater networks. The solution is clear: measure, manage, reduce. In 2025, the comb
Read More
FAQs (Frequently Asked Questions) About PLC
FAQs (Frequently Asked Questions) About PLC
Programmable logic control systems (PLC) have become an indispensable tool of modern industrial automation. Programmable logic controllers are an essential cog in industrial systems and provide flexib
Read More
CATALOG