How To Buy
EN
TR

Mikrodev IoT protocol gateway product family was preferred in the Istanbul Anadolu Yakası OIZ Automatic Meter Reading System Project in Türkiye. In the current system, over the MDC100 Series IoT Gateway product family, more than 200 electricity meters are read with the IEC 62056-21 protocol and more than 200 water meters are read with the MODBUS protocol and the data is transferred to the remote system. Data transfer to remote systems is carried out via the integrated GSM modem. Report outputs (.xlsx file format) can be created by selecting the report template over ViewPLUS SCADA.

  • More than 50 stations
  • Over 12000 data tracking via ViewPLUS SCADA
  • Over 400 electricity meters and water meters
  • Daily, monthly consumption values on the basis of stations
  • Project designs suitable for billing system
  • Energy data monitoring and analysis portals
  • Ability to export energy data in .xlsx format
  • Full integration with other systems via database

Electiricity Meter Report Template:

Water Meter Report Template:

Other Post
All Posts
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Mikrodev IoT protocol gateway product family was preferred in the Istanbul Anadolu Yakası OIZ Automatic Meter Reading System Project in Türkiye. In the current system, over the MDC100 Series IoT Gatew
Read More
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
Georgian Oil & Gas Corporation (GOGC) Rustavi RMS System
RTU300 series remote terminal unit products and MBS100 series MODBUS gateway product were used in the RMS system commissioned in Georgia. Energy data is monitored over the ViewPLUS SCADA system over M
Read More
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
Imagine a water reservoir located outside the city. The water level inside drops rapidly at midnight, the pump needs to start, but there is no one on site. If it takes hours for a technician to arrive
Read More
What is RTU and How Does It Work?
What is RTU and How Does It Work?
RTU stands for "Remote Terminal Unit" in English. Used in industrial automation systems, RTU is a type of hardware component used to increase the functionality of a device. These modules are used to e
Read More
What are Industrial Automation Products?
What are Industrial Automation Products?
What are Industrial Automation Products? Industrial automation involves using control systems, computers, and robots to automate an enterprise's production processes; and industrial automation produc
Read More
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
In industrial or commercial IoT projects, IoT gateways play a crucial role in ensuring accurate and fast data flow between devices. An IoT gateway brings together different protocols, devices, and app
Read More
Salda Lake Environmental Protection Wastewater Management System
Salda Lake Environmental Protection Wastewater Management System
MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry o
Read More
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
In the evening hours, voltage drops on a feeder, lights flicker on some streets, the field team says “the transformer is overloaded,” but no one at the control center can speak clearly. This picture i
Read More
HANNOVER MESSE 2023
HANNOVER MESSE 2023
We have left behind the exciting 5 days of Hannover Messe 2023 Fair, which was held for the 76th time this year and brings together hundreds of thousands of visitors and industry leader companies ever
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
CATALOG