MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry of Environment, Urbanization and Climate Change.

  • Over 10 stations, MP110 series PLC
  • Over 150 data control via ViewPLUS SCADA
  • Data transmission to ViewPLUS SCADA via MODBUS communication protocol
  • Control of drainage system
  • Monitoring tank level
  • Pump control with aging
  • Exhaust fan control
  • Alarm tracking
  • Reporting historical data

Other Post
All Posts
Pressure, Flow, and Leakage Management in Water Distribution SCADA Systems: An RTU-Focused Approach
Pressure, Flow, and Leakage Management in Water Distribution SCADA Systems: An RTU-Focused Approach
Imagine a water network as an invisible city. Its streets are pipes, its traffic is water, and its traffic lights are valves and pumps. In this city, problems rarely come alone; pressure, flow, and le
Read More
What are the Differences Between PLC and RTU? 
What are the Differences Between PLC and RTU? 
In the world of industrial automation, PLC (Programmable Logic Control) and RTU (Remote Terminal Unit) are two substantial devices. They are both used to automate and monitor process control, however,
Read More
Understanding the Differences Between PLC, DCS & SCADA
Understanding the Differences Between PLC, DCS & SCADA
Understanding the Differences Between PLC, DCS & SCADA - A Selection Guide In today's industrial landscape, the selection of an appropriate control system architecture plays a pivotal role in ens
Read More
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
How accurate is time alignment in industrial systems? Time synchronization means reliable data and accurate decisions in the field. An incorrect clock creates large gaps in fault analysis and quality
Read More
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
As modern energy grids evolve from one-way power flow to two-way, dynamic, and smart grid structures, the backbone of this transformation is formed by communication protocols. In a Substation Automati
Read More
WIN EURASIA 2023
WIN EURASIA 2023
We left behind the WIN EURASIA 2023 Automation Fair, one of the most important organizations in the region. We presented the new technologies we brought to our products and the new product families we
Read More
AFAD Disaster And Emergency Management Presidency Shelter & Command Center Automation
AFAD Disaster And Emergency Management Presidency Shelter & Command Center Automation
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in the Shelter and Command Center Automation. In the shelter system, alarm monitoring, energy monitoring and HVAC system contro
Read More
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
In SCADA projects, thousands—sometimes even hundreds of thousands—of data points flow every second.Temperature, pressure, motor current, meter values… All of them are continuously generated together w
Read More
SCL (CID, SED, ICD) Engineering in Substation Automation: From File to Commissioning
SCL (CID, SED, ICD) Engineering in Substation Automation: From File to Commissioning
In a substation automation project, everything seems to start with cables and panels. But the moment you open your first packet capture file in the field, you see the reality: the backbone that carrie
Read More
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information. 4 MP211
Read More
CATALOG